Finternet Ops™ Training
Stage 3.5 • Operator Install
Operator

Operator Install Guide

Enterprise-friendly deployment path with auditability, human review, and change control.

Install Home Integration Checklist Deployment Readiness

0) Pre-flight (must-have)

  • Signed SOW + data handling terms
  • Executive sponsor + operational owner + escalation contacts
  • Approved input sources (settlement status, exceptions, liquidity indicators)
  • Logging destination defined + audit trace requirements

1) Deployment architecture (reference)

  1. Ingest: pull approved feeds (batch or stream) into staging
  2. Normalize: map to consistent schema
  3. Analyze: run agents to summarize, rank, and report
  4. Review: human validation step (owner signs off)
  5. Publish: distribute briefs/queues to approved channels
  6. Trace: store evidence links + change logs
Implementation specifics (prompts/config/orchestration) remain gated by partner tier and delivery docs.

2) Minimum viable pilot bundle

  • Settlement Watchdog → breaks visibility
  • Exception Triage → ranked queue
  • Executive Brief → leadership clarity

3) Change control rules

  • All threshold/routing changes require owner + timestamp + reason
  • No silent changes — update audit log
  • Weekly false-positive review cadence
  • Rollback plan for major tuning

4) Go-live checklist

  • Least-privilege access verified
  • Logging enabled (who/what/when)
  • Human review documented
  • Incident response path defined
  • Client sign-off on reporting cadence
Partner-only

Operator Install Pages (Soft-Gated)

These pages include implementation and integration details intended for licensed MBCC partners. This is a deterrent gate (static sites can’t enforce real security). Do not redistribute.

Required tier: • See IP Notice
Enter your partner access phrase (from MBCC onboarding).